HOME  »  SBMWA Photo Galleries » Restoration Gallery »  Viewing Hobler Park Before     [Image 3 of 26]  :: Jump To  
  First slide Previous slide      No EXIF Info Index Page Start/Stop the slide show      Next slide Last slide  
Clerico Farm Before

Clerico Farm July 2003

Next slide
 
Hobler Park Before
Hobler Park July 2003

Hopewell Boro Bridge Before

Hopewell Boro Bridge July 2003

Hopewell Boro Before

Hopewell Boro June 2003

The 8.76 acre Hobler Park site close to a tributary of the Beden Brook was the site of a reforestation in the Spring of 1997 and the Fall of 1999 and 2002.
Album last updated on 6/27/05 3:34 PM
Powered by JAlbum 5.2 and WatershedBPP skin